• image
  • image
  • image
  • image
  • image

PROJECT DETAILS

  • Location: Bedford Park, IL
  • Contract Value: $6,828,528
  • Owner: Village of Bedford Park
  • Engineer: Baxter and Woodman
  • Delivery Method: Design-Bid-Build

PROJECT DESCRIPTION

A new pumping station building, including water piping up to 54-inch diameter, chlorine gas equipment, heating, plumbing, instrumentation and controls, site improvements and restoration, approximately 1,050 feet of 36-inch diameter water main, 180 feet of 48-inch diameter water main, 55 feet of 54-inch diameter suction pipe, site improvements, installation of two 250 HP vertical pumps, four 300 HP vertical pumps, and a prefabricated meter vault. Key aspects involve scheduling and coordination with the owner to keep the plant in operation during the improvement stages.