- Location: Bartlett, IL
- Contract Value: $7,269,048
- Owner: Village of Bartlett
- Engineer: Christopher B. Burke Engineering
- Delivery Method: Design-Bid-Build
Installation of two 1.5 Million Gallon Water Storage Tanks, a 60’ x 80’ Water Receiving and Water Pumping Station, yard piping, landscaping and restoration.