• image
  • image
  • image
  • image
  • image

PROJECT DETAILS

  • Location: Frankfort, IL
  • Contract Value: $3,562,436
  • Owner: Village of Frankfort
  • Engineer: Baxter & Woodman, Inc.
  • Delivery Method: Design-Bid-Build

PROJECT DESCRIPTION

The existing laboratory at the West W.W.T.P. was demolished and a new lab building was constructed at the Regional W.W.T.P. The new lab building includes a laboratory, locker rooms, break room, mechanical room, network room, and a 3-bay garage. The updates to the headworks portion of this project consist of replacing the existing mechanically cleaned screen, adding a second mechanical screen, and a second grit tank housed in the preliminary treatment building.