Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the kirki domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Twin Lakes 2021 Wastewater Upgrades - Joseph J Henderson & Son, Inc.

Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /var/www/wp-content/plugins/js_composer/include/classes/core/class-vc-mapper.php on line 186
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

PROJECT DETAILS

  • Location: Twin Lakes, WI
  • Contract Value: $11,828,000
  • Owner: Village of Twin Lakes
  • Engineer: Town & Country Engineering, Inc.
  • Delivery Method: Design-Bid-Build

PROJECT DESCRIPTION

Construction is underway for the wastewater treatment system project in Twin Lakes, WI. This contract will upgrade the current plant to increase its capacity to required levels along with improving 12 lift station sites located within the Village. The site will  receive a new sludge storage tank, sludge thickening building, and electrical building while modifications are made to the existing  treatment processes and structures, equipment replacement and installation, pipe work, and the site. This project is expected to be completed by early 2023.