- Location: Twin Lakes, WI
- Contract Value: $11,828,000
- Owner: Village of Twin Lakes
- Engineer: Town & Country Engineering, Inc.
- Delivery Method: Design-Bid-Build
construct
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121kirki
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121Construction is underway for the wastewater treatment system project in Twin Lakes, WI. This contract will upgrade the current plant to increase its capacity to required levels along with improving 12 lift station sites located within the Village. The site will receive a new sludge storage tank, sludge thickening building, and electrical building while modifications are made to the existing treatment processes and structures, equipment replacement and installation, pipe work, and the site. This project is expected to be completed by early 2023.